Office area and airplane storage and maintenance facility.
Addition, completed December 2006, included extending the 300-ft.-wide hangar 25 feet in length, installing a 10,500-sf concrete apron with hydronicheat at hangar entrance, and erecting office and garage areas on either side of hangar.
Original construction: Delta Joist steel structure with Butler BR-2 wall and MR-24 roof systems; Office/garage additions: GEM steel, MBCI wall panels, Butler MR-24 roof system.